Construction of the RDC KENYA campground 4
We have started making the roof framework. The reinforce steel has been dropped down inside the blocks which will give the building its strength.
This is the framework with the reinforce steel in it getting built. The whole team is working on it.
The tradesman have to be perfect when measuring the lengths.
We have had a great run with sunny days which is helping to keep the work moving forward.